A Regional Health System

Adding four senior engineers in three weeks when hiring would have taken five months

A regional health system had approved headcount, a fully scoped roadmap, and a patient-portal release date tied to a payer contract it could not move — but a five-month average time-to-hire. Four vetted senior engineers embedded into the existing platform team, worked under the client's own technical leadership, and the release shipped on its original date.

3 weeks

From first conversation to first merged pull request

4

Senior engineers embedded into the existing platform team

0 days

Slip against the committed release date

38%

Increase in sprint throughput by the third sprint

Read the example

A Mid-Sized Regional Bank

Modernizing a core banking platform without a cutover weekend

Core banking modernization without a big-bang cutover: a regional bank moved capability out of a twenty-year-old core in slices, behind an API abstraction layer, so digital products could ship while the legacy platform kept running underneath.

14 months

Elapsed time to retire the first three core functions

0

Big-bang cutover events required

6

Digital products shipped before core replacement completed

99.98%

Core availability maintained across the migration window

Read the example

A National Property and Casualty Insurer

Cutting claims cycle time with document AI and automated triage

Insurance claims automation applied where it actually pays back: a national property and casualty insurer replaced manual first-notice-of-loss rekeying with document AI, automated triage, and straight-through processing for low-complexity claims — leaving adjusters on the claims that need judgement.

62%

Low-complexity claims processed without manual data entry

3.1 days

Reduction in average time from first notice of loss to adjuster assignment

0

Changes required to the policy administration system

4x

Increase in claim documents processed per adjuster hour

Read the example

A Freight Visibility Software Provider

Rebuilding a single-tenant freight platform as multi-tenant SaaS

SaaS product development for a logistics software provider whose growth had stalled on its own architecture: forty-one customer-specific deployments were consolidated into a single multi-tenant platform, cutting onboarding from weeks to hours and making one release serve every customer.

41

Customer-specific deployments consolidated into one platform

4 hours

New customer onboarding, down from an average of three weeks

1

Release train serving all tenants, replacing per-customer branches

71%

Reduction in monthly infrastructure spend per customer

Read the example

A Multi-Brand Retail Group

A cloud migration built for peak season, not the test plan

Cloud migration services applied to a retailer whose data centre could not absorb Black Friday: three commerce brands were moved to a cloud-native platform in waves, with autoscaling proven against replayed peak traffic before a single customer request was routed to it.

3

Commerce brands migrated in sequenced waves, none in a single cutover

11x

Peak-to-baseline traffic absorbed by autoscaling without manual intervention

44%

Reduction in annual infrastructure run cost after right-sizing

0

Unplanned outages during the first peak trading period after migration

Read the example

An International Industrial Manufacturer

Replacing 60 point-to-point interfaces with one API layer

System integration services for a manufacturer running eleven plants on sixty undocumented point-to-point interfaces: ERP, MES, warehouse, and shop-floor systems were consolidated behind a governed API and event layer, so production data stopped arriving a day late.

60+

Point-to-point interfaces replaced by a governed API and event layer

11

Plants brought onto a single integration pattern

Near real time

Shop-floor to ERP data latency, previously an overnight batch cycle

2 weeks

Time to connect a new plant system, down from an average of four months

Read the example

A Regional Utility and Grid Operator

Building a grid asset data platform regulators can audit

Data engineering services for a utility whose asset and telemetry data lived in nine systems with no shared definitions: a governed lakehouse with end-to-end lineage replaced a quarterly reporting scramble and made condition-based maintenance possible.

9

Source systems consolidated into one governed data platform

Hours

Regulatory submission preparation, down from a multi-week reconciliation cycle

100%

Reported figures traceable to source through automated lineage

15 min

Telemetry freshness for condition monitoring, previously daily

Read the example

A Multi-Specialty Physician Group

Using AI to take the paperwork out of prior authorization

Healthcare AI applied to an administrative problem rather than a clinical one: a physician group automated prior authorization assembly and payer rule matching, cutting the staff time behind each request and reducing avoidable denials — with a clinician approving every submission.

18 min

Average staff time per authorization request, down from 47 minutes

31%

Reduction in denials attributable to incomplete or incorrect submissions

100%

Submissions reviewed and approved by a clinician before sending

0

Clinical decisions made by the system

Read the example

A State Government Benefits Agency

Replacing a six-week manual regression cycle with test automation

QA automation and DevOps for a benefits agency releasing twice a year because regression testing took six weeks: an automated test suite and a governed deployment pipeline brought the agency to monthly releases without loosening a single control.

6 weeks to 9 hours

Full regression cycle duration after automation

2 to 12

Production releases per year

1,900+

Automated tests covering statutory eligibility and payment rules

0

Audit or change control requirements removed to achieve it

Read the example

A Higher Education Technology Provider

Clearing a security backlog before it cost the enterprise deals

Application security services for an education technology provider losing enterprise deals at the security questionnaire: architectural findings were remediated, controls were moved into the pipeline, and SOC 2 readiness stopped being an annual scramble.

4

Enterprise procurement cycles previously stalled at security review

100%

Critical and high findings remediated before SOC 2 audit fieldwork

Every build

Security scanning moved from annual penetration test to pipeline gate

Days

Security questionnaire turnaround, previously several weeks

Read the example

A Mid-Market Tour Operator

Digital transformation for an operator still running on spreadsheets

Digital transformation sequenced by revenue impact rather than by system age: a tour operator taking most bookings by phone replaced spreadsheet-based inventory and a decade-old reservation system in stages, starting with the one that was actually costing it money.

6 systems

Retired, including the spreadsheet-based inventory the business ran on

2.3%

Bookings previously lost to double-sold inventory, now eliminated

Real time

Inventory availability across web, agent, and partner channels

Stage 1 of 4

Point at which the programme became self-funding

Read the example

Let's build the system your business will run on next.